Drainage And Water Supply System, Heating System(Gas Boiler and Floor Heating), HVAC System(DX units) and Gas System.
Drainage And Water Supply System, Heating System(Boiler and Fancoil Units), HVAC System(Chiller) and Firefighting System.
Drainage And Water Supply System, Heating System(Gas Boiler and Floor Heating), HVAC System(DX units) and Gas System.
Solar energy system.(39 Nos. solar collectors, 2 Nos. Hot Water Storage Tanks Capacity=1500L each)
Drainage And Water Supply System, Heating System(Gas Boiler and Floor Heating) and HVAC System(DX units)
Drainage And Water Supply System, Heating System(Gas Boiler and Radiators) and HVAC System(DX units)
Drainage And Water Supply System, Heating System(Boiler, Solar and Radiators) and HVAC System(DX units)
Drainage And Water Supply System, Heating System(Boiler and Radiators) and HVAC System(DX units)
Drainage And Water Supply System, Heating System(Boiler and Fancoil units), HVAC System(Chiller) and Gas system
Drainage And Water Supply System, Heating System(Boiler and Radiators) and HVAC System(DX units)
Steam pipes from steam plant to children’s cancer center.(2005),Carpentry duct extraction.(2007),Renovation of 5 labs in the Biology Building.(2008),Renovation of lab 209 in Biology Building.(2008),Renovation of lab 108 in Agriculture.(2009),Bechtel outdoor climatic chambers.(2009),IOEC site excavation & MEP tunnel civil works.(2009),Extraction duct lab 402.(2009),Nicely Hall class rooms third floor.(2009),Science library ; 2 Nos. Package units located on roof.(2009),Cafeteria Renovation of plumbing works.(2010),College Hall Data Center.(2011) and OSB independent chiller.(2013)
You’re looking for a reliable mechanical Contractor or you’re looking to take the next step in your career, we want to hear from you!
Contact Us